IMG_0276_edited.jpg
electrical-maintenance-icon.png
SHEAR SPRAY INSTALLATION

Ardagh Group - Doncaster - UK

 

JB Engineering Services LTD installed the electrical and pipework services along with the structural supports to cover the full shear spray system of three I.S machines, designed and supplied by Graphoidal.

Tidy containment and well identified service supplies provided the customer with easy access and visuals to follow the service to source, for any maintenance and future modifications.

IMG_0229_edited.jpg

Installation of four control cabinets and one pumpset supplied by Graphoidal, using correct skate equipment.

IMG_0230_edited.jpg

Installation of cable management for mains power and wire basket to support nylon pipes to each machine.

IMG_0231_edited.jpg

Cable management installed to local distribution board, with wire basket continuous to machines.

SCOPE OF WORKS

JB Engineering Services LTD scope as follows:

  • Installation of control panels.
     

  • Installation of pump sets.
     

  • Installation of water tanks.
     

  • Installation of two separate containment systems, for cable and pipework.
     

  • Installation of main supply cables.
     

  • Installation of interconnecting and signal cables.
     

  • Installation of manifolds.
     

  • Installation of pipework.
     

  • Termination of all electrical connections.
     

  • Connection of all pipework.
     

  • Labelling of all system.

quote-icon_edited.png
CLIENT TESTIMONIAL